We present this house with a basic project presented in July 2023 awaiting the execution and demolition project. It cannot be renovated, the only option is to build a new project.
The project is distributed as follows:
8 homes:
- 8 Storage rooms on floor -1
- 3 Studios on floor 0
- 3 Studios on floor 1
- 2 Duplex apartments with 2 and 3 bedrooms on floor 2
GROUND FLOOR + 2 + UNDER ROOF
509.44 M2 INTERIOR
20.44 M2 PATIO
5.22 M2 COVERED TERRACES
26.19 M2 UNCOVERED TERRACES
If you need more information, do not hesitate to contact us.
Päivitetty: 18.07.2024 klo. 05:15